咨询热线:

0531-88771136

您的当前位置: 首页 > 新闻中心 > 正文

山东beplay全站app安卓加工厂家告诉你注塑beplay全站app安卓是怎么样试模的?

来源:http://www.jnhjgs.cn     发布时间:2021-07-16 11:43:45    点击:

山东beplay全站app安卓加工厂家告诉你注塑beplay全站app安卓是怎么样试模的?
Shandong mold processing factory tells you how to test the injection mold?
为了避免不必要的时间浪费和大规模生产,我们确实需要耐心调整和控制各种工艺条件,找到的温度和压力条件,测试注塑beplay全站app安卓标准,并建立日常工作。可用方法。注塑beplay全站app安卓测试的主要步骤是:
In order to avoid unnecessary time waste and mass production, we really need to patiently adjust and control various process conditions, find out the temperature and pressure conditions, test the injection mold standards, and establish daily work. Available methods. The main steps of injection mold testing are as follows:
1.检查桶中的塑料是否正确,并根据需要进行烘烤。
1. Check whether the plastic in the barrel is correct, and bake as needed.
2.应彻 底清洗材料管,以防止不良胶水或混合物进入beplay全站app安卓,因为不良的胶水和混合物会堵塞beplay全站app安卓。检查材料管和beplay全站app安卓的温度,看它是否适合材料。
2. The material pipe should be cleaned thoroughly to prevent bad glue or mixture from entering the mold, because bad glue and mixture will block the mold. Check the temperature of the material tube and mold to see if it is suitable for the material.
3,调节压力和注射,以产生满意的产品外观,但不能运行闪光,特别是腔体和一些成品没有完全冷冻,应考虑各种控制条件,调整前,因为beplay全站app安卓填充利率变化一点,将导致巨大的变化。
3. Adjust the pressure and injection to produce a satisfactory appearance of the product, but the flash can not run, especially if the cavity and some finished products are not completely frozen, various control conditions should be considered. Before adjustment, because the mold filling rate changes a little, it will lead to huge changes.
                         山东beplay全站app安卓
4.耐心等待机器和beplay全站app安卓处于稳定状态可能需要30多分钟,即使对于中型机器也是如此。利用这段时间看看产品可能出现的问题。
4. It may take more than 30 minutes to wait patiently for the machine and mold to be in stable state, even for medium-sized machines. Use this time to look at possible problems with the product.
5,螺杆的推进时间不应小于浇口上塑料的凝固时间,否则会降低成品的重量,破坏成品的性能。当beplay全站app安卓被加热时,螺杆的前进时间延长以压缩成品。
5. The advancing time of the screw should not be less than the solidification time of the plastic on the gate, otherwise the weight of the finished product will be reduced and the performance of the finished product will be damaged. When the mold is heated, the advance time of the screw is extended to compress the finished product.
6.合理调整并缩短整个加工周期。
6. Reasonably adjust and shorten the whole processing cycle.
7.新的稳态至少需要30分钟,然后根据型腔,检查操作的稳定性和合理的控制,在多的日期,数量和个别位置连续生产至少12种完整形状的产品。退出容差。
7. The new steady state takes at least 30 minutes, and then according to the cavity, check the stability of operation and reasonable control, continuously produce at least 12 kinds of complete shape products in multiple dates, quantities and individual positions. Exit tolerance.
8.测量并记录连续样品的重要尺寸(冷却至室温后)。
8. Measure and record important dimensions of continuous samples (after cooling to room temperature).
联系我们 contact

山东济南beplay全站app安卓_铝合金压铸厂-山东宏捷beplay全站app安卓有限公司

电话1:13173017488

电话2:18615459955

传真:0531-88771136

邮箱:hlm369@126.com

地址:山东省济南市大桥镇大王村北跨商务中心后三层白楼

山东济南beplay全站app安卓_铝合金压铸厂-山东宏捷beplay全站app安卓有限公司 手机: 13173017488 咨询热线: 0531-88771136 咨询热线:18615459955    邮箱:hlm369@126.com

公司地址: 山东省济南市大桥镇大王村北跨商务中心后三层白楼